The Franklin expansion project is continuing on schedule. Workers are completing the painting, drop ceilings, and the heating and air conditioning system.
An Ivy Tech alumnus is preparing the HVAC system.
The student commons area is increasing in size.
A worker is installing a new louver.
A construction supervisor is checking the ceiling track.